7 October 2017
The Project
This project involved the relocation of cryostores for Cells4life.
We relocated 17 tanks containing liquid nitrogen with stem cell samples in them, all tanks were vapour phase. We relocated 15 from Bishops Stortford and two from Rochdale.
They were all transported to our storage site in Uckfield, East Sussex. We transported two tanks per trip with one trip per day, this was to comply with insurance conditions due to the value of goods being up to £3m per tank.
The Challenge
Due to design, weight and condition of some of the tanks we were unable to use a standard forklift truck to relocate them. To overcome this we used a reinforced tail lift. This provided more stability and therefore more safety onsite.
We also used ADR compliant vehicles and utilised our in house DGSA who ensured that all elements were covered and captured prior to and during the relocation so that everything was done correctly and following guidelines. He completed specific RAMS for the logistics and answered any questions that arose throughout the planning and relocation period.
The Result
Everything went well and without any problems. We have a good relationship with Cells4Life and have now completed several projects for them. We continue to quote for and undertake work for them on a regular basis.